Skip to content
Vaughan Plumbing CompanyVaughan Plumbing CompanyHonest pipework, handsomely doneCall now(365) 414-5823

What is under the cap

Basement Bathroom Rough-Ins

Lots of Vaughan builders left three capped drains in the basement concrete for a future bathroom. Knowing what you have before planning the bathroom saves money and surprises.

  • Steps you can do with basic tools
  • Where the homeowner part ends and ours begins
  • Written for Vaughan houses and weather
  • A plumber on the phone if you get stuck
.
  • Licensed plumbers · details on request
  • Fully insured work
  • Fix explained before we start
  • Clean-up included
.
Tiled shower with a pebble floor and drain

Quick call

(365) 414-5823
Hours
Mon–Sat 7 am – 7 pm · urgent calls by phone
Area
City of Vaughan & nearby York Region
Call now.

What a rough-in includes

Typically you get a 3 inch stub for the toilet, 2 inch for the shower, 1½ inch for the basin, plus a vent. They are capped and stub up through the concrete.

Before planning

  • Confirm locations against the floor
  • Check the vent connection
  • Confirm drain depth relative to the sewer
  • Decide if layout can stay as roughed-in

Moving fixtures

Moving drains means breaking concrete. A sewage ejector may be needed if the fixture is below sewer level.

Permits are usually required for basement bathrooms.

Help

See bathroom renovation plumbing.

Venting and the sewage ejector question

Every fixture needs a vent. In a builder rough-in, a single vent stub usually serves the group, connected to the main stack or running up through the house. If the vent was capped off or never connected, the new bathroom will gurgle and drain slowly. Confirm the connection before finishing walls.

Where the basement floor sits below the sewer connection, or the fixtures are far from the main, a sewage ejector pump in a sealed basin lifts waste to the drain. Ejectors need a dedicated circuit, a check valve and a vent. They are reliable but need occasional service.

Checking the stubs

  1. Uncap each stub and run water into it to confirm it drains.
  2. Tape from where the drywall will finish to the toilet stub centre to confirm the rough-in.
  3. Check the shower drain location against the planned shower size.
  4. Look for a cleanout and keep it accessible after finishing.
Handbook

When to put the tools down

Some of this is homeowner work and some is not. Stop and phone us if you see any of these:

  • Drip that will not stop at any handle position
  • Shower swings hot and cold
  • Lever grinding or wobbling
  • Swollen, damp cabinet floor
  • Anything involving the gas line, the venting or cutting into a wall

Ready when you are

Leak, clog or no hot water? Call and talk to a plumber.

We pick up, we explain the fix before we start, and we leave your home as tidy as we found it.

Call (365) 414-5823Mon–Sat 7 am – 7 pm · urgent calls by phone
Call now · (365) 414-5823